
Stage 5 (2022) “Traveling and Holidays”
$20.00
This is an actual case study that was presented to the participants of the Financial Modeling World Cup 2022, Stage 5 (July 22-25).
Case study description:
This case involves forecasting the operating kilometers of a new electric railway over a period of 20 years from 1 October 2022 to 30 September 2042, and then forecasting the amount and cost of electricity required to run the trains.
The downloadable file consists of the following:
–Task: PDF file with Case Materials; PDF file with Questions; Excel file with initial data and case assumptions
–Solution: Excel file with full Solution Model; PDF file with correct Answers in Bold